Summit Fertilizers – PM Installation of HDPE Lining and Piping

Our Role

March 23 – June 23

  • Designed by Engineered Efficiency
  • Tendered package
  • Awarded to Brilly
  • MMS assisted with install
  • Installed free issue pumps (skids from Allflow Melbourne)
  • MMS installed cable containment, conduit and cable ladder
  • Designed and constructed concrete blocks for use on electrical boards

CONTACT US

If you would like to discuss an upcoming project. Start a conversation click the button below.

TOP