Summit Fertilizers – STO Project

Our Role

Oct 23 – Jan 24

  • Temporary ship loading and unloading infrastructure approved by Fremantle Ports to unload ships of UAN direct into trucks on wharfs
  • Designed by Engineered Efficiency
  • Brilly constructed
  • MMS built control panels (24 volt)
  • MMs conducted tests and trials
  • MMS conducted hazops
  • MMS project managed between Summit, Engineered Efficiency and Fremantle Ports
  • Fitted out iso containers with spill prevention controls
  • Built truck unloading manifold at ponds
  • Liaised with Matic Transport
  • Oversaw continuous improvement modifications